The role of a site engineer in a construction project of high rise buildings to accomplish several tasks to complete the project within stipulated period retaining complete precision.

The site engineer should examine the activities/work on construction site and makes sure that everything conforms with the schedule, plan design. Given below, the role and liabilities of a site engineer in a construction project of high rise buildings.

BRICK WORK:

1. Throughout the brickwork, the vertical alignment of bricks should be checked on a regular basis at the time of piling brick by applying a plumb-bob that is connected with a rope.
2. For 9-inch wall, the rod is not required. But for making brick-work of 4 ½ inch wall, a single rod should be arranged after each 5 layers of brick.
3. Throughout brick-work, the bricks should be soaked in water prior to utilize them in brick work of wall.
4. At the time of brickwork, small gap should be provided among bricks and the gap should be stuffed perfectly with cement mix.
5. Chipping should be performed in the beams and columns prior to start of the brick work.

CASTING OF SLAB, BEAMS AND COLUMNS:

1. The props utilized for providing support to shuttering plies (while casting of slab and beam) should retain proper vertical alignment and the spacing among these props shouldn’t go beyond 1m. Props should be perfectly secured.
2. While casting of slab, there should not be any leakage of concrete from down-side of shuttering plies. If occurs, it should be examined and hole should be closed.

Also Read: Some useful tips to study civil engineering drawings

3. Spacing of rings and form work should be examined on the basis of the drawing of beams and slabs.
4. Leveling of slabs and beams (shuttering plies) should be examined with theodolite prior to casting.
5. Small pieces of concrete block should be added under the form work to retain the spacing.
6. The plywood applied for supporting the slab should be altered once it is utilized for casting slabs 3-4 times.

FINISHING:

1. 90 degree should be retained in all nooks and corners of room at the time of plastering or finishing.
2. Finishing of Plaster work should be examined properly.
3. Ensure to keep proper alignment of walls and ducks.
4. Dimensions of windows, doors & other components of room should also be examined.